Van Gogh Museum - Collectie Data Knowledge Graph - the-other-interface - Nieuwe Instituut LOD

Van Gogh Museum

An open model on behalf of the renovation of the Van Gogh Museum. The original model was most likely made between 1963-172 under the supervision of J. van Tricht. Around 1992 the model was used as a working model by the architect F. Wintermans for a renovation of the museum. The model shows the design that was carried out in outline form. The renovation consists of closing the windows on the museum square side. This is visible on the model. The model is loose, sunk into the base plate.

Van Gogh Museum

An open model on behalf of the renovation of the Van Gogh Museum. The original model was most likely made between 1963-172 under the supervision of J. van Tricht. Around 1992 the model was used as a working model by the architect F. Wintermans for a renovation of the museum. The model shows the design that was carried out in outline form. The renovation consists of closing the windows on the museum square side. This is visible on the model. The model is loose, sunk into the base plate.